The summer stage is facility that is used fully during summer period. Beside the traditional Festival of European Film Palic, it hosts many plays, concerts and performances every year.
As this been said, it was necessary to invest in reconstruction that has begun last year, so today the second phase of adaptation is in progress. Funds are provided for the following items:
- Arrangement of the backyard ( pavement, construction of a tent, construction of pits for dogs, repair of the sidewalk behind the backstage)
- Repair of the inner part of towers
- Rehabilitation of stairs on both sides of the stage
- Repair of the roof of the atrium at the main entrance
- Repair of damaged facade parts (toilet, dressing room, warehouse, security facility)
- Remediation of the internal part of the room for projections (floors, walls, ceilings, carpentry, electrical installations)
- Reconstruction of toilets Installing new lighting and reconstructing existing ones
- Removing old and installing new stylish street lights
- Setting up garbage bins